Walterdale Bridge

In 2015, we were hired by ACCIONA to provide survey support during the construction of the Walter Dale Bridge. This is high precision work requiring a 3 mm tolerance. Our equipment required monthly calibration and constant maintenance to ensure we met the required accuracy. We worked on site until the bridge was completed and opened.